D2 are extremely pleased to announce that they have secured a new commission for an extension and remodel of a Primary School in Cardiff. Work is due to start on site on the £800k scheme just before Christmas (2010). We have been commissioned by Bridgend based contractors, Jehu Project Services and look forward to hopefully furthering our working relationship with them.

05/01/11
Work has now started on site with Piling Operations being carried out ready for the reinforced ground beams.
05/02/11
The concrete floor slab is being laid for the new link extension. The Durisol Blockwork is being 'stacked out' ready for laying.The ground floor superstructure should be erected within a week.


Image above of the Durisol Blockwork - visist www.durisol.net , super quick, super efficient, ticks many of the boxes required for recycled content and the unit we are using here provides a U Value to the wall of 0.19 W/m2K even before any finishes are applied. The blocks are dry stacked and the voids filled with concrete.....its as simple as that.
more to follow.............